Serving as a ramp to one of the portables it was ripped off during construction of the new school and dropped in the practice field to be junked.
Getting out to Wildcat can be challenging when the wetland floods so the bridge project was launched in early 2010.
At first it served for as a stage |
All classes except the 2nd graders were put into action. |
Team work was paramount for the 500 lbs+ too be moved and positioned |
The 90deg turn was difficult but the 4th grade was up to the task |
There was a lot of grunting sweating to get across the swale and onto the concrete piers (recycled from cut up concrete floor) |
Job complete! |